Service Delivery & Installation Policy

Turnaround times, hardware delivery, on-site setup, and line activation standards for ABS CABLE NETWORK.

Operations Protocol

Delivery & Field Execution Timeline

Effective Date: January 1, 2026

This Service Delivery Policy outlines how ABS CABLE NETWORK handles hardware delivery, physical optical fiber cabling, SITI Digital Set-Top Box installation, and connection activation in Paschim Medinipur.

1. New Connection Fulfillment Timeline

  • Standard Urban & Semi-Urban Delivery (Soyla & Sonakhali): Installation is completed within 24 to 48 hours of application receipt and technical feasibility verification.
  • Extended Rural Localities: In remote parts of Paschim Medinipur requiring long optical fiber spans, installation is accomplished within 2 to 4 working days.

2. Installation & Handover Process

Our certified technician will:

  • Inspect physical line accessibility from the nearest optical distribution point (ODP) or coaxial tap.
  • Securely route drop fiber cable or RG-6 coaxial wire into your premises.
  • Install and configure the SITI Digital Set-Top Box or Optical ONT Wi-Fi Router.
  • Conduct signal strength and optical dBm loss tests to ensure crystal-clear reception and rated download/upload speed.
  • Demonstrate channel selection / Wi-Fi configuration and hand over the equipment along with an official acknowledgement receipt.

3. Digital Recharges & Plan Activation Delivery

  • Online subscription renewals and top-ups are activated instantaneously (within 2 to 10 minutes) upon payment clearance by our automated billing system.

4. Service Delivery Coverage Area

Our primary active delivery zones include Soyla, Sonakhali, Debra, Pingla, Sabang, and adjoining blocks across Paschim Medinipur, West Bengal.

Technical Standards

Quality & Reliability Installation Standards

Precision Optical Fusion Splicing

Every core joint is fused using high-precision core-alignment arc splicers resulting in minimal optical insertion loss (<0.02 dB).

Weather-Hardened Drop Fiber

Heavy FRP dielectric messenger wire withstands heavy wind gust speeds and intense monsoon rainfall without sagging or snapping.

dBm Power Level Certification

Optical power is calibrated between -15 dBm and -22 dBm to guarantee consistent Gigabit data rates and low ping.

STB HDMI / AV Tuning

Complete channel scanning and audio profile setup to match your Smart TV, OLED, or CRT television.

Installation FAQs

Installation & Delivery Frequently Asked Questions

A standard home installation takes between 45 to 90 minutes. This includes pulling the fiber drop wire from the nearest distribution pole, interior wall clipping, optical terminal box splicing, router configuration, and live signal testing.

Yes. Our technical installation crew operates 7 days a week from 8:00 AM to 7:00 PM. You can specify your preferred date and time slot when booking your connection.
Track Your Installation Booking

Call our dispatch coordinator at +91 8967248808 / +91 9732723027 for real-time technician status.

Contact Operations